Play Live Radio
Next Up:
0:00
0:00
0:00 0:00
Available On Air Stations

Southside Connector, I-10 Construction Closure Dates Announced

FDOT
This map shows the detour map for a planned June 4-5 Southside Connector construction closure.

The Southside Connector (State Road 113) southbound on-ramp from Regency Square Boulevard North will close Thursday, June 3, at 7 a.m. and will reopen Friday, June 4, by 6 p.m. for work as part of the Southside Connector resurfacing and improvement project.Southbound Southside Connector traffic will be detoured via the Southside Connector Service roads (north and south) to and from Tredinick Parkway, according to the Florida Department of Transportation (FDOT).

Credit FDOT
/
FDOT
This map shows the section of I-10 and the detour area for scheduled overnight construction closures June 4-5.

FDOT has also announced overnight closures of the Interstate-10 eastbound and westbound lanes from U.S. 301 to State Road 23 (First Coast Expressway) are scheduled Friday, June 4, and Saturday, June 5, for work related to the Yellow Water Road Bridge replacement project.

Friday, June 4: I-10 eastbound lanes from U.S. 301 to State Road 23 will close at 8 p.m. and reopen by 8 a.m. Saturday.

Saturday, June 5: I-10 westbound lanes from State Road 23 to U.S. 301 will close at 8 p.m. and reopen by 8 a.m. Sunday.

Both I-10 detours will utilize Beaver Street (U.S. 90) via the State Road 23/First Coast Expressway ramp (westbound) and via the U.S. 301 (eastbound) ramp back to I-10.